FMR Cost Analysis
Road Details |
Item 200(1) |
Item 201(1) |
Item 206(1) |
Item 311(1)b1 |
Savings |
Conventional Method |
/ |
/ |
|
/ |
x |
Using 30% in-situ Soil |
/ |
|
/ |
|
50% |
Using 50% in-situ Soil |
/ |
|
/ |
|
52% |
Using 100% in-situ Soil |
|
|
/ |
|
58% |
L= 1040m, W= 5m, Thickness= 0.2m
Costs of using Item 200, Item 201 |
₱ 4,934,890.40 |
Costs of using Item 200, Item 206 |
₱ 4,110,305.47 |
Savings |
₱ 824,584.92 or 17% |
|
|
Costs per sqm? ₱/sqm of Farm to Market roads
Conventional |
₱ 2,022.64 |
Using Roadpacker plus |
₱ 1,923.04 |
Cost per cu.m.? ₱/cu.m. of Farm to Market roads
Conventional |
₱ 10,417.50 |
Using Roadpacker plus |
₱ 8,924.44 |
|