Design Engineer’s Punchlist Cheat Sheet (DRAFT) by [deleted]

Design Engineer’s Punchlist

This is a draft cheat sheet. It is a work in progress and is not finished yet.

Introd­uction

The design engineer shall check off the boxes from the list of company’s standa­rdized field observ­ation checklists below that he will need to upload on to his tablet computer prior to heading out to the constr­uction site to complete his final H&V inspection and punchlist. These checklists will be touchs­creen type. When the engineer returns to the office or he sends the completed checklists via the internet to the office, the completed checklists shall be automa­tically downloaded to the company’s computer server and placed in the job folder’s “Project Closeout” section of the folder. The completed checkl­ists, along with associated digital photog­raphs taken at the time of the field visit, will automa­tically be electr­oni­cally sent to the following indivi­duals and depart­ments.
Source: Back2Basic Esmagazine

Team Corres­pon­dence Directory

Project Architect
Owner Repres­ent­ative
IPD Manager
Constr­uction Manager
General Contractor
Design­-Build Contractor
Facility Manager
HVAC Subcon­tractor
BAS Subcon­tractor
State Energy Department
ASHRAE
Piping Subcon­tractor
Sheet Metal Subcon­tractor
3rd-Party IC Commis­sioning Consultant
3rd-Party Commis­sioning & TAB Consultant
Equipment Manufa­cturers
Building Inspector
Others: (insert list)
 

HVAC Contract Specif­ication Checklist

Division 1 Project Closeout
Industrial Process Equipment
Owner Furnished Equipment
Structural
Electrical
Plumbing
Fire Protection
H&V
Infection Control
ATC
Generator
Pumps
Chillers
Fans
Air Handlers
Terminal Units
Exhaust Piping System
Sheet Metal System
TAB
Commis­sioning
Others:

HVAC Contract Drawing Instal­lation checklist

Industrial Process Equipment
Owner Furnished Equipment
Structural
Electrical
Plumbing
Fire Protection
HVAC
Infection Control
ATC
Generator
Pumps
Chillers
Fans
Air Handlers
Terminal Units
Heating & Ventil­ation System
Exhaust Piping System
Sheet Metal System
Equipment Room
Tel-Data
Others:
 

HVAC Startup checklist

Industrial Process Equipment
Owner Furnished Equipment
Structural
Electrical
Plumbing
Fire Protection
HVAC
Infection Control
ATC
Generator
Pumps
Chillers
Fans
Air Handlers
Heating & Ventil­ation System
Terminal Units
Exhaust Piping System
Sheet Metal System
Equipment Room
Tel-Data
Others:

Commis­sioning FPT

(Funct­ional Perfor­mance Test)
Industrial Process Equipment
Owner Furnished Equipment
Structural
Electrical
Plumbing
Fire Protection
HVAC System
Infection Control System
ATC System
Central HVAC Air System
Heating & Ventil­ation System
Chilled Water System
Generator
Pumps
Chillers
Fans
Air Handlers
Terminal Units
Piping System
Sheet Metal System
Equipment Room
Tel-Data
Others: